NAVIGATION MAIN MENU

COMPENDIUM LIBRARY/TWITTER MONITOR
VIDEO GALLERY
Economic News
Newsbrief Archives
Democrat Leadership Twitter and Realtime Feeds
Cabinet twitter and realtime feeds
North America weblog
International weblog
Democrats twitter directory
Latest Government Jobs and Public Tenders
Jobs Matrix
Global Travel Information
Pop Entertainment Forum
Start Portal


Please make a donation to support upkeep of the daily news journal, back archives, twitter feeds and the compendium library.










CTBT: International Data Centre

Daily newsbrief journal for March 2011, also see http://www.usdemocrats.com/twitterarchive for daily twitter archive briefs and follow twitter @usdemocrats


CTBT: International Data Centre

Postby admin » Wed Mar 30, 2011 4:04 am

CTBT: International Data Centre


Fact Sheet

Bureau of Arms Control, Verification and Compliance

March 29, 2011




Key Point: The International Data Centre (IDC) is the focal point within the CTBTO Provisional Technical Secretariat for collecting, analyzing, storing, and reporting the information collected by the stations that constitute the International Monitoring System (IMS). The IDC distributes data and reporting products relevant to verification of the Treaty.
The IDC is located at the CTBT Organization (CTBTO) headquarters in Vienna, Austria, but receives information from all the monitoring stations worldwide both in real-time and after events.
The data provided from these stations is processed and analyzed and subsequently disseminated to all CTBTO Member States in both raw and analyzed forms.
When North Korea carried out its announced nuclear tests in 2006 and 2009, the IDC provided information to Member States within two hours that described the location, seismic magnitude, time and depth of the events. Radionuclide evidence collected at Yellowknife, Canada after the 2006 event was consistent with a release from a nuclear explosion in North Korea. The IMS did not detect radionuclide evidence following the 2009 explosion.
However, it is important to recognize that at that time, only 22 of the planned 40 radionuclide stations, which monitor particulate and noble gases (including radioactive xenon), were operational. With the full complement of radionuclide stations functioning, characterization of an event by States Party to the Treaty could be quicker and more definitive.
The 2009 event also emphasized the role that the verification regime’s on-site inspection (OSI) component could play in determining whether a nuclear explosion has occurred. This measure would be available after the Treaty’s entry into force.
admin
Site Admin
 
Posts: 82092
Joined: Fri Nov 27, 2009 7:00 am

Return to March 2011

Who is online

Users browsing this forum: No registered users and 17 guests

cron